Home

The Problem The Solution Contact Us
 

 

 

Gravitair™... Power Your Imagination!

Gravitair Rights, Inc. is positioned to complete the facilitation of its initial necessary administration structuring and developmental needs within 12 to 18 months at which time contracts may begin to be executed for the build of these power plants.

Expert analysis and research will need to be made in each plant's build and due to the nature of these power plant configurations, partial load power generation may start as early as a year, to a year and a half, after construction has commenced on a power plant utilizing the GRAVITAIR™ technology.

Due to the nature of the process used to produce power via these methods, the cost of producing power is projected to be $20 per mega-watt hour electric or even less (much less). At just an 85% load the larger implementations capable of serving up to over 8+ gigawatts continuously are projected to afford a capitalization rate of ±3 years.

The time is now! The science is real and we are now one step closer to the age of a
non-carbon burning civilization.

 
 
  Meet The Inventor   The Time Line   Our Objectives  
  Meet Major Gavin Wilson (USAF Ret.)

Gavin is a Masters graduate of the Air Force Institute
of Technology who has also taught advanced classes at the Institute.

Gavin now manages multi-billion dollar programs for the military.
  The process produces energy in a completely clean and renewable manner and can be implemented almost anywhere.

And it will not take years to perfect as the process is now ready for testing and evaluation, and final research and development.
  We could be in production in as little as 18 months but to be conservative we will say 2 to 3 years before larger projects can begin energy production.

We do anticipate the demand for our process to grow exponentially therefore allowing for the power produced in this manner to do the same.
 
 
       


© 2011 - Gravitair Rights, Inc. - All Rights Reserved